1

Adey MagnaClean Atom 22mm
Adey MagnaClean Atom 22mm
£139.99
MSRP:
£139.99 per System Filter
£125 installation
Protect your central heating system against the harmful effects of black iron oxide sludge now. The Adey MagnaClean Atom 22mm is compact and can fit into even the tightest of spaces.
Loading


Every one of our engineers are fully qualified.
We cover every UK postcode.
Rated Excellent on Trustpilot.
The Adey 22mm MagnaClean Atom is an energy-saving water treatment filter that saves 6% on annual heating bills. It is designed to protect your central heating system against black iron oxide sludge.
The Adey MagnaClean Atom fits vertical and horizontal pipework for additional flexibility in installing and servicing. It’s been proven to extend your heating system’s lifespan and reduce your home’s carbon emissions.
Get a 10-year warranty on the filter parts from Adey for added peace of mind.
Local Installers on a National Network.
We cover every UK postcode.

Dimensions
Height 42mm
Width 180mm
Depth 45mm
6% annual saving on heating bills
Immediate ongoing system protection
Extended system life
Reduced carbon emissions
10-year warranty when registered within 30 days of installation
Installation by a local Gas Safe Engineer (arriving between 8-11am)
Removal of existing system (inclusive of tanks if applicable)
Removal of installation rubbish off site including boiler
Boiler flue installation
Magnetic filter for ongoing protection
System cleanse of your heating system
Inhibitor and System cleaner for protection
Condensate pipework or upgrade (if applicable)
Gas pipe upgrade (if required)
Copper and fittings pack with pipe work installation
Re-wire of existing controls
CO Alarm included
Delivery of package via courier or your local engineer
12-month WarmZilla workmanship warranty
Registration of warranty and Building Control Certificate by WarmZilla
Warranty includes parts and labour free via the manufacturer
Full protection of property, surfaces, and workspace throughout installation
Handover of your new boiler, including control panel and pressure top-up guide
Removal of redundant pipework and accessories (where necessary)
Removal of any old or unused controls (if applicable)
Sealing of external flue and condensate pipework to the building fabric
Making good of any brickwork around the flue exit
Commissioning of your new boiler for full operation
Balancing of your heating system (if required)
Final tidy-up and removal of all protective coverings





