1

CB Angled TRV with Lockshield 15mm Chrome
CB Angled TRV with Lockshield 15mm Chrome
£29.99
MSRP:
£29.99 per Thermostatic Valves
£199 installation (when ordering
5 or more
Thermostatic Valves)
This 15mm Chrome Center angled TRV with lockshield is reliable and has ultra-precise temperature control thanks to a liquid sensor and a bi-directional valve design.
Loading


Every one of our engineers are fully qualified.
We cover every UK postcode.
Rated Excellent on Trustpilot.
This 15mm Chrome Center angled TRV with lockshield is reliable and has ultra-precise temperature control thanks to a liquid sensor and a bi-directional valve design. Fully certified with Keymark, this TRV offers any homeowner peace of mind and easy stress-free installation.
Local Installers on a National Network.
We cover every UK postcode.

Colour
Chrome
Dimensions
Height 75mm
Width 50mm
Depth 50mm
Liquid sensor
Bi-directional valve
7 - 29degC Thermatic Range
Frost Protection
Keymark Certified
EN 215 approved
15mm connections
Chrome Finish
Installation by a local Gas Safe Engineer (arriving between 8-11am)
Removal of existing system (inclusive of tanks if applicable)
Removal of installation rubbish off site including boiler
Boiler flue installation
Magnetic filter for ongoing protection
System cleanse of your heating system
Inhibitor and System cleaner for protection
Condensate pipework or upgrade (if applicable)
Gas pipe upgrade (if required)
Copper and fittings pack with pipe work installation
Re-wire of existing controls
CO Alarm included
Delivery of package via courier or your local engineer
12-month WarmZilla workmanship warranty
Registration of warranty and Building Control Certificate by WarmZilla
Warranty includes parts and labour free via the manufacturer
Full protection of property, surfaces, and workspace throughout installation
Handover of your new boiler, including control panel and pressure top-up guide
Removal of redundant pipework and accessories (where necessary)
Removal of any old or unused controls (if applicable)
Sealing of external flue and condensate pipework to the building fabric
Making good of any brickwork around the flue exit
Commissioning of your new boiler for full operation
Balancing of your heating system (if required)
Final tidy-up and removal of all protective coverings





