1

Fernox Electrolytic Scale Reducer 15mm
Fernox Electrolytic Scale Reducer 15mm
£42.99
MSRP:
£42.99 per Water Treatment
£85 installation
The Fernox electrolytic scale reducer uses electrolytic principles to stop the build-up of scale throughout your home. Its effect can last up to 10 years (based on water usage).
Loading


Every one of our engineers are fully qualified.
We cover every UK postcode.
Rated Excellent on Trustpilot.
The Fernox 15mm Electrolytic Scale Reducer lowers the limescale build-up in the pipes throughout your home. It works by breaking down and altering the hardness of salt in your system.
This scale reducer is designed for hard water over 200ppm and meets Part L of the building regulations. No maintenance is required, and it can last up to 10 years, depending on how much water is used.
Local Installers on a National Network.
We cover every UK postcode.

Dimensions
Height 40mm
Width 212mm
Depth 40mm
Lasts for up to 10 years
No maintenance
WRAS approved product
Whole house protection
An in-line scale reducer to prevent the build-up of scale using electrolytic principles
Installation by a local Gas Safe Engineer (arriving between 8-11am)
Removal of existing system (inclusive of tanks if applicable)
Removal of installation rubbish off site including boiler
Boiler flue installation
Magnetic filter for ongoing protection
System cleanse of your heating system
Inhibitor and System cleaner for protection
Condensate pipework or upgrade (if applicable)
Gas pipe upgrade (if required)
Copper and fittings pack with pipe work installation
Re-wire of existing controls
CO Alarm included
Delivery of package via courier or your local engineer
12-month WarmZilla workmanship warranty
Registration of warranty and Building Control Certificate by WarmZilla
Warranty includes parts and labour free via the manufacturer
Full protection of property, surfaces, and workspace throughout installation
Handover of your new boiler, including control panel and pressure top-up guide
Removal of redundant pipework and accessories (where necessary)
Removal of any old or unused controls (if applicable)
Sealing of external flue and condensate pipework to the building fabric
Making good of any brickwork around the flue exit
Commissioning of your new boiler for full operation
Balancing of your heating system (if required)
Final tidy-up and removal of all protective coverings





