Need some advice
1
Sentinel X400 Cleaner 1000ml

Sentinel X400 Cleaner 1000ml

SKU: 70-703-02

£14.99

MSRP:

£14.99 per Water Treatment
£85 installation
The Sentinel X400 is a reliable cleaner for your heating system. It restores circulation to radiators and pipework and improves your heating system efficiency.
Loading

Don't Just Take Our Word For It: See Why UK Homeowners Trust WarmZilla!

Partner of CompareTheMarket & MoneySuperMarket

Trust Pilot Star

Rated Excellent on Truspilot

Trusted Partner of Checkatrade

The Sentinel X400 is a reliable heating system cleaner designed to remove sludge and maintain your pipework.

It consists of a non-acidic treatment that restores circulation to radiators and existing pipework.

Its decisive action shifts the build-up of magnetite sludge, removing cold spots in your radiators and restoring even heat distribution.

Local Installers on a National Network.

We cover every UK postcode.

Restores systems suffering with circulation problems
Eliminates radiator cold spots
Prepares older systems for the installation of new components
Has a non-acid formula which does not cause pin-holing or leaks
Can be used in all types of indirect heating systems
Installation by a local Gas Safe Engineer (arriving between 8-11am)
Removal of existing system (inclusive of tanks if applicable)
Removal of installation rubbish off site including boiler
Boiler flue installation
Magnetic filter for ongoing protection
System cleanse of your heating system
Inhibitor and System cleaner for protection
Condensate pipework or upgrade (if applicable)
Gas pipe upgrade (if required)
Copper and fittings pack with pipe work installation
Re-wire of existing controls
CO Alarm included
Delivery of package via courier or your local engineer
12-month WarmZilla workmanship warranty
Registration of warranty and Building Control Certificate by WarmZilla
Warranty includes parts and labour free via the manufacturer
Full protection of property, surfaces, and workspace throughout installation
Handover of your new boiler, including control panel and pressure top-up guide
Removal of redundant pipework and accessories (where necessary)
Removal of any old or unused controls (if applicable)
Sealing of external flue and condensate pipework to the building fabric
Making good of any brickwork around the flue exit
Commissioning of your new boiler for full operation
Balancing of your heating system (if required)
Final tidy-up and removal of all protective coverings